Project Listing
NO | YEAR | PROJECT |
---|---|---|
1 | 2012 | CITECH (CENDOR PH-2-DEV) |
2 | BCOT-EPCC NEW CONDENSATE TANK | |
3 | SOME (NON-PROCESS PRESSURE VESSELS) | |
4 | AUSSIE 1 (READINESS OF EPCI CONTRACT FOR PIPELINE REPLACEMENT PROJECT 2012) FOR PERTAMINA HULU ENERGI OFFSHORE WEST | |
5 | FRAMES (CHEMICAL INJECTION SKID) | |
6 | ZEECO (ACID GAS INCINERATION STACK) | |
7 | SIEMENS (CARTAGENA REFINERY EXP PROJECT) | |
8 | EMERSON (CRUDE & CONDENSATE MATERIAL SKID) | |
9 | ALSTOM (CONDENSATE RESERVE TANK) | |
10 | EPCC OF TANK TERMINAL | |
1 | 2013 | STEAM COIL UPGRADING FOR SULPHUR PIT T35201 |
2 | PSR1-TA PROJECT | |
3 | CDU-2 HGO PUMBACK PROJECT | |
4 | TAPIS FOR BROWNFIELD MODIFICATIONS AND RETROFITS PROJECT | |
5 | PEMBANGUNAN SALURAN PIPA MINYAK BAWAH LAUT DARI XB PLATFORM KE XA PLATFORM LAPANGAN X-RAY | |
6 | TNS 8 UNITS TOTE TANK | |
7 | INSTALLATION AND DEVELOPMENT OF UNDERWATER OIL PIPE FOR PT. PERTAMINA EP X-RAY FIELD PROJECT | |
8 | MURPHY FIELD DEVELOPMENT | |
9 | PROVISION OF NEW PROPOSED OFFICE AT NILAI YARD FOR ENGINEERING DEPARTMENT | |
10 | MNLG SATU AGRU UPGRADE & MISCELLANEOUS WORK | |
11 | TAPIS PRECOMMISSIONING PROJECT | |
12 | PS025-13 & DEOILING 18" GUE/TA-F PROJECT | |
13 | EMEPMI DAMAR/ LAWIT PRE-COMMISSIONING PROJECT | |
14 | CONSTRUCTION OF BUNDWALL FOR T-21251 AT U21 | |
15 | AUSSIE 1 PAD STOCK AND DARK ROOM & LINE UP ROOM | |
16 | AUSSIE 1 POST PROJECT MAINTENANCE AND UPGRADING WORKS | |
17 | DIYARBEKIR OIL DEVELOPMENT PROJECT FOR PETRONAS CARIGALI | |
18 | SGRSB NILAI YARD FOR YARD MAINTENANCE | |
1 | 2014 | GRE PIPING MATERIAL & INSTALLATION |
2 | KPOC DEWATERING, VACUUM & N2 | |
3 | CONSTRUCTION OF BUNDWALL FOR T-21251 AT U21 | |
4 | SCHLUMBERGER 1,2 UNIT FUEL TANK | |
5 | EPCC OF BITUMEN TERMINAL | |
6 | DFSB-LOCAL EQUIPMENT ROOM (LER) | |
7 | 20" X 12" F23 FIELD PRECOMM PROJECT | |
8 | INTEROIL FABRICATE & SUPPLY OF E-145 SHEEL & TUBE ASSEMBLY | |
9 | BARAM (IP) TA JUNE 2014 PROJECT | |
10 | EPCIC FOR BAYAN REDEVELOPMENT PROJECT PHASE 1 OIL INFILL-DECK EXTENSION | |
11 | D12 LAILA FLEXIBLE PIPELINE | |
12 | INDEPENDENT DEEPWATER PETROLEUM TERMINAL (IDPT) | |
13 | EVA PRECOMM PIPELINE PROJECT | |
14 | MAMBONG TO WEST KALIMANTAN 275KV TRANSMISSION LINE PROJECT | |
15 | PUMA LANGSAT BITUMEN TERMINAL FUEL OIL CONVERSION | |
1 | 2015 | TANK 26 & 27 SCHLUMBERGER |
2 | FM200 SYSTEM FOR ATB PHASE-II TERMINAL PROJECT AT TANJUNG BIN, JOHOR | |
3 | MAMBONG TO WEST KALIMANTAN 275KV TRANSMISSION LINE PROJECT | |
4 | PIGTRAP PROJECT- RE FABRICATION NEW BARREL R-0900C (P001-002-15) | |
5 | PENGERANG GAS PIPELINE PROJECT | |
6 | TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR GARAGOL DENIZ OIL DEVELOPMENT PROJECT | |
7 | 132KV TRANSMISSION LINE TURN-IN WORKS FOR STAKAN SUBSTATION | |
8 | SAMSUNG RGT-2 PETRONAS PROJECT | |
9 | PIGTRAP PROJECT- INSTALL NEW ENCLOSURE DORR R3000 & R3010 | |
10 | PIGTRAP PROJECT- INSTALL NEW ENCLOSURE DORR L4070 & L4090 | |
11 | 20" X 30KM BSDP-A/ANDR-4 PRECOMM PROJECT | |
12 | SITE TEMPORARY FACILITIES LOCATED AT RAPID SITE | |
13 | SAMSUNG RGT-2 PETRONAS PROJECT | |
14 | FSO SEPAT COST PLUS PROJECT | |
1 | 2016 | REFURBISHMENT PIGS SSB/ SSPC PROJECT |
2 | PROVISION FOR PRE-COMMISSIONING FOR BARDEGG PROJECT | |
3 | PROVISION FOR “MURPHY PRECOMM 2016” PROJECT | |
4 | DFSB- SUPPLY OF MERCURY REMOVAL UNIT FOR SK310 B15 DEVELOPMENT | |
5 | PROVISION FOR PENGERANG GAS PIPELINE PROJECT (RIVER CROSSING & PHASE 3) | |
6 | CDU2/ VDU HEAT RECOVERY (PINCH) PROJECT (PN21-0062) | |
7 | MRU PROJECT-SKE | |
1 | 2017 | 106AG SUPPORT AND SUPPORT DUMY AND TRUNNION PIPE |
2 | STRUCTURE REFUSE NO.01, OSD 3, CONSUMER (UP TO GROUND SLAB) BRIDGE | |
3 | LFO PIPING & FITTING FOR JIMAH PROJECT | |
4 | SHELL- BLI GANTRY & TRUCK EXIT UPGRADE | |
5 | INSTALLATION OF FACILITIES FOR DIESEL EURO 5 AT TGI TERMINAL | |
6 | EPCC OF ARU, SRU,SWS,LSSU & SSU UNITS FOR RAPID PROJECT | |
7 | SHELL SEPANGAR BAY | |
8 | TANK MODIFICATION, PIPING & STRUCTURE WORKS PR-001-17 | |
9 | SHELL HOT OIL HEATER TANK PROJECT | |
10 | CONDENSATE WATER STORAGE TANKS FOR JIMAH PROJECT 2 X 1000MW COAL FIRED POWER PLANT | |
1 | 2018 | D28 PROJECT |
2 | ASSEMBLE BRC ACTUATOR ONTO 3000# 8’’ BALL VALVE | |
3 | UNIGRA PROCESS PIPING PROJECT AT TANJUNG LANGSAT | |
4 | RAPID STEAM CRACKER COMPLEX PROEJCT | |
5 | GOREK KO DRUM PROJECT | |
6 | MURPHY PROJECT PORT DICKSON | |
7 | MALACCA DIESEL EURO 5 PIPING FABRICATION PROJECT | |
8 | REFRIGERATED GASEOUS TANK FACILITY FOR ETHYLENE & PROPYLENE | |
9 | PIPE PIG RECEIVER D 18 PROJECT | |
10 | PLR ACCESS PLATFORM | |
11 | UNIGRA HWS PROJECT | |
1 | 2019 | D28 PROJECT |
2 | EMERSON TANJUNG LANGSAT PROJECT | |
3 | P33 RAPID EXCESS LP STEAM TUBINE GENRATOR | |
4 | ARV MG3 PROJECT | |
5 | SMP GREENFIELD FOR TECHNIP/ ARKEMA 2 -KERTEH | |
6 | PEGAGA PROJECT | |
7 | DBOG 320 EPCIC FOR PM9 SIMPLIFICATION PROJECT | |
8 | LGT3 REFURBISHMENT & MODIFICATION | |
9 | STATIC MESH SCREEN COOLING TOWER | |
10 | E&I PACKAGE FOR TRACK 4A 1440MW CCGT POWER PLANT | |
11 | ATB PHASE 2 EXPANSION WORK | |
12 | KINARUT PROJECT | |
13 | WASTEWATER DEGASSER | |
1 | 2020 | PRESSURE VESSEL MUHIBBAH PROJECT |
2 | P33 EPCC OF RAPID EXCESS LP STEAM TURBINE GENERATOR | |
3 | BERGADING CPP- MRU INTERGRATION PROJECT | |
4 | GLYCOL HEAT EXCHANGER DAYANG | |
5 | CDV PEMANIS & HESS PROJECT | |
6 | NPP PROJECT | |
7 | E&I WORK FOR PDT 3 | |
8 | BUNDLE FRAME EPIC OG PROJECT | |
9 | PFC GE UNIQUE TANK DISSOLVING BASKET | |
10 | EPCC OF NEW AIR COMPRESSOR AT GAS PROCESSING PAKA SANTONG | |
11 | REPLACEMENT OF HOT OIL & EXPANSION JOINT | |
12 | VORPLEX PROJECT | |
13 | SBI EQUIPMENT RESORCES | |
14 | JITANG GENERATOR 3 PACKAGE | |
1 | 2021 | Supply, Delivery & Installation of LV Electrical System, Instrumentation & Control System for Project Lotus |
2 | EPCC for New Air Compressor Project at GAS Processing Saritong, Paka Terengganu | |
3 | D18 GAS LIFT COMPRESSOR UPGRADE | |
4 | PSFII OF PIPING WORKS AT MARINE JETTY AND OFFSITES FOR RESET 2.0 PROJECT (WP20A) | |
5 | EPCIC of Kasawari Gas Development Project | |
6 | OCP SALT MITIGATION PROJECT - SVS SEPARATOR | |
7 | BLACK CONDENSATE & HEAT INTEGRATION PROJECT FOR PETRONAS PENAPISAN (TERENGGANU) SDN BHD, PACAKGE 1 (CFU) - PIPE SUPPORT | |
8 | SHELL PGI - SECTION 3 PIPELINE UNDERNEATH KTMB RAILWAY | |
9 | KINABALU NAG FIELD PROJECT -GAS DEHYDRATION & GLYCOL REGEN. PACKAGE | |
10 | EPC FOR DTL3 EXPANSION - PHASE 1 | |
11 | SATIN MRU PEGAGA PROJECT | |
12 | EPCC & Operation Maintenance of Solar PV Ground Mounted and Solar PV Roof Top Facility at Pengerang Integrated Complex (PIC) and Seluyut Darn (PAMER) | |
13 | SUPPLY OF OFFSHORE SKID EQUIPMENT | |
14 | EPCC and O&M of Solar PV Ground and Roof Mounted at PIC & PAMER | |
15 | EPC Fire Suppression-Phase 1 | |
16 | Top Glove F44SL Package B - MEPl | |
17 | SHELL PGI - REPLACEMENT OF CARGO PIPELINE | |
18 | PORTABLE WATER PHASE 2 - TERMINAL (EYE WASH) | |
19 | SHELL SBI - REPLACEMENT OF HOT OIL & BINTUMEN EXPANSION JOINT | |
1 | 2022 | EPCC for PGB PGU II Sector 3 Compressor Relocation Project (SCORE) |
2 | SK318 TIMI DEVELOPMENT PROJECT - Vent KO Drum | |
3 | Sapura/Mubadala Pegaga MRU package | |
4 | SUPPLY AND DELIVERY OF TUBE BUNDLE (SHELL & TUBE) FOR REFINERY ASSET REJUVENATION TIGA (RESET), MRCSB | |
5 | Top Glove F44SL Package B - MEPl | |
6 | SHELL SBI CP1 NO.1 REFURBISHMENT | |
7 | EPCC for New Air Compressor Project at GAS Processing Saritong, Paka Terengganu | |
8 | EPCC OF TREATED WATER PIPELINE PACKAGE | |
9 | SHELL PGI - SECTION 3 PIPELINE UNDERNEATH KTMB RAILWAY | |
10 | MECHANICAL & ELECTRICAL WORK PACKAGE | |
11 | OCP SALT MITIGATION PROJECT - SVS SEPARATOR | |
12 | SHELL BAGAN LUAR - JET A1 DEADLEG REPLACEMENT | |
13 | SHELL SEPANGGAR BAY - TANK 2 | |
14 | Term Contract for Plant Change - PRefchem | |
15 | TANK 8 & ELECTRICAL FIRE PUMP SHED MOTOR REFURBISHMENT | |
16 | SHELL INTERCEPTOR PROJECT | |
17 | MECHANICAL & ELECTRICAL WORK PACKAGE | |
18 | Term Contract for Plant Change - PRefchem ** ARDS GAS SEAL PANEL | |
19 | MKM 308, MALAY-SINO CHEMICAL, KEMAMAN TERENGGANU | |
20 | Term Contract for Plant Change - Prefchem - Bulk Materials - Steel Support (Piping) | |
21 | BTU-PST-Bellow Project-Materials | |
22 | PGI - Pump Fighting Pump Upgrade Airline | |
23 | MECHANICAL & ELECTRICAL WORK PACKAGE | |
24 | PM.C-17-7943-T-18A8 - PROCUREMENT OF MATERIALS FOR UPGRADE WI MAGNETIC FLOWMETER TO DP FLOWMETER PROIECT AT CDW-A/B/C | |
25 | INDUCED GAS FLOATATION (IGF-450A) |